The Restaurant Prime Cost Guide

The formula, benchmarks by concept, a worked example, and the weekly routine that keeps food, beverage and labor cost in range.

By Rob Bruni, founder of OpsEdge Hospitality, twenty years running restaurants, bars, clubs and resorts. Updated November 2026.

Free printable: Weekly Prime Cost Close checklist (PDF)

Prime cost is food cost, beverage cost and labor cost added together, as a percent of sales. It is the biggest share of every dollar a restaurant or bar takes in, and it is the part you can actually control from the floor. This guide covers the formula, the benchmarks for each concept, a worked example, the weekly routine we use with operators, and what to do when the number comes in high.

What prime cost is, and why it is the number to watch

Every restaurant has two kinds of cost. Fixed costs like rent, insurance and loan payments are set when you sign the lease and barely move week to week. Controllable costs move with every shift: what you buy, what you waste, what you pour, and who you schedule. Prime cost is the sum of the controllable costs that matter most, which is cost of goods sold (food and beverage) plus total labor.

In most operations prime cost is 55 to 68 percent of sales. Rent is usually 6 to 10 percent. That is why we tell managers to stop staring at the rent line and start watching prime cost. A two point move in prime cost on a $2 million restaurant is $40,000 a year, and a two point move happens quietly, one over-scheduled Tuesday and one careless walk-in at a time.

The other reason to watch it is timing. Most managers first see their costs on the monthly P&L, three to four weeks after the money is gone. Prime cost can be worked out every Monday from numbers you already have, which turns a report into a control.

The prime cost formula

Prime cost % = (Cost of goods sold + Total labor cost) ÷ Total sales × 100

Where:

  • Cost of goods sold (COGS) is beginning inventory, plus purchases, minus ending inventory, for food and for beverage. If you do not count inventory weekly, purchases alone will do for a weekly check, as long as you count at least monthly to true it up.
  • Total labor cost is every dollar it costs to have people on the clock: hourly wages, salaried management, payroll taxes, workers' comp, health benefits and paid time off. Wages alone understate labor by 15 to 25 percent, which is the most common reason a prime cost looks better than it is.
  • Total sales is net sales, after comps, voids and discounts, before sales tax.

Keep the three parts separate on your sheet. A 62 percent prime cost made of 30 percent food, 8 percent beverage and 24 percent labor needs a different fix than one made of 26, 6 and 30.

A worked example

A full service restaurant, one week

Net sales: $48,000

Food purchases (adjusted for inventory): $14,400 (30.0%)

Beverage purchases (adjusted): $3,360 (7.0%)

Hourly wages: $11,500. Salaried management: $2,300. Taxes and benefits: $2,200. Total labor: $16,000 (33.3%)

Prime cost: ($17,760 + $16,000) ÷ $48,000 = 70.3%

At 70 percent, this restaurant is roughly five points above the top of the full service range. Five points on $48,000 a week is $2,400 a week, or about $125,000 a year. Notice that food is inside the normal band. Labor is the problem, and within labor the question is whether it is too many hours, hours in the wrong places, or overtime. That is why the parts matter more than the total.

Prime cost benchmarks by concept

There is no single right number. Service style, menu, market and whether you own the building all move it. These are the ranges we use as a starting point, then we track the operation's own trend.

ConceptPrime cost targetFoodBeverageLabor
Quick service / fast casual55 to 60%28 to 32%18 to 24%25 to 30%
Full service restaurant60 to 65%28 to 34%18 to 24%30 to 35%
Bar or beverage-led50 to 55%28 to 34%18 to 22%25 to 30%
Fine dining / private club62 to 68%30 to 36%22 to 28%33 to 38%

Food, beverage and labor percentages above are each measured against their own sales where you can split them (food cost against food sales, pour cost against beverage sales). Prime cost is always against total sales.

Two things to keep in mind. First, a low prime cost is not automatically good. A 52 percent full service restaurant is usually understaffed or under-portioning, and guests notice both before the P&L does. Second, the trend matters more than any single week. A restaurant that holds 63 percent every week is in better shape than one that swings between 58 and 69.

Put your own numbers in

The free prime cost calculator takes four numbers and shows your percent against the benchmark for your concept, plus what each point is worth in dollars over a year. No signup.

Open the calculator Get the weekly Excel sheet

Why prime cost runs high

After twenty years of looking at these numbers, the causes fall into a short list. Most operations have two or three of them at once.

On the food side

  • Nobody is counting. Without a weekly inventory, waste, theft and over-ordering are invisible until the month closes.
  • Menu prices have not kept up with invoices. Vendor prices move every quarter. If your menu has not been re-costed in a year, your real food cost is probably two to four points above what you think it is.
  • Portions drift. A 6 ounce portion that becomes 7 ounces on a busy line is a 17 percent increase in cost on that plate.
  • Too many SKUs. Every extra product is another thing to count, rotate and waste.

On the beverage side

  • Free pouring with no spot checks. A quarter ounce over on every pour is 15 to 20 percent of your liquor walking out the door.
  • Comps and spills are not rung in. If it is not on the POS it is invisible, and it lands in your pour cost as a mystery.

On the labor side

  • The schedule is written from habit, not from a sales forecast. Tuesday lunch gets the same floor as Friday because it always has.
  • Overtime is approved after the fact. Time and a half on the wrong shifts adds a point to labor on its own.
  • Managers are not counted. Salaried labor, taxes and benefits get left off the weekly number, so the real labor cost shows up only on the P&L.

How to track prime cost weekly

This is the routine we install with operators. It takes about 30 minutes on Monday once the first two weeks are set up.

  1. Close sales for the week. Pull net sales by category (food, beverage, other) from the POS.
  2. Pull purchases. Total every food and beverage invoice dated in the week. If you count inventory weekly, adjust for the change in stock. If you count monthly, use purchases and accept some noise.
  3. Pull labor. Hourly wages from the time clock, plus the weekly share of salaries, plus taxes and benefits at your real burden rate (usually 15 to 25 percent of wages).
  4. Work out the three percentages and the total. A spreadsheet does this in seconds. The free weekly Prime Cost Check sheet is built for exactly this step.
  5. Compare to last week and to target. Look for the part that moved, not just the total.
  6. Decide one action for the week. One. A re-cost of the top ten sellers, a schedule change for the slow shifts, a spot-check of pours. Then check next Monday whether it moved the number.

The point of weekly tracking is not the report. It is that a bad week costs you one week instead of a month.

What to do when it comes in high

Start with the part that is furthest out of its band, and fix in this order, because it is the order of speed.

  1. Labor, this week. Rewrite next week's schedule from the sales forecast by hour, not from last week's schedule. Cut the first hour and last hour of the slow shifts before touching the peak. Stop approving overtime that was not planned.
  2. Beverage, this month. Measure pours for one week. Put every comp and spill through the POS. Count the bar weekly, by weight or by tenths, and compare what you sold against what you used.
  3. Food, this quarter. Re-cost your top 20 sellers against current invoices and reprice or re-portion the ones that are off. Cut SKUs that sell fewer than a case a week. Set a par and order to it.

A two to three point improvement in 90 days is realistic for most operations that have not been tracking. Five points is common when labor has never been scheduled to a forecast. Our Playbooks and Toolkits hold the full weekly systems for each of these, and the Prime Cost System page lays out the help available when you want someone to do the first pass with you.

Want a second set of eyes on it?

The $495 Remote Prime Cost Review looks at four weeks of your real sales, purchases, inventory and payroll and shows you the three biggest leaks in dollars, with a 60-minute call to walk through the fixes. Fully remote, any US operation.

See the Prime Cost System On-site services

Related guides and tools

Free printable

Weekly Prime Cost Close checklist (PDF)

The Monday routine and worksheet we use to close the week: which numbers to pull, in what order, and the target bands to compare against. Two printable pages.

You also get The Operator's Edge, one practical email a week. Unsubscribe in one click.

Here it is. We also sent a confirmation to your inbox.

Download the PDF

FAQ

What is prime cost in a restaurant?

Prime cost is cost of goods sold (food and beverage) plus total labor cost, expressed as a percent of total sales. It is the largest controllable cost in any restaurant or bar and the single best weekly measure of whether the operation is making money.

What is a good prime cost percentage?

Most full service restaurants aim for 60 to 65 percent. Quick service and fast casual run lower, around 55 to 60 percent. Bar-led concepts can run 50 to 55 percent. Fine dining and private clubs often run 62 to 68 percent because of higher labor. The trend week to week matters more than any single number.

How do I calculate prime cost?

Add food cost, beverage cost and total labor cost for the period, then divide by net sales for the same period and multiply by 100. Labor should include wages, salaries, payroll taxes and benefits, not wages alone.

Should salaried managers be included in prime cost?

Yes. Any cost of having people working in the operation belongs in labor, including salaried management, payroll taxes, workers' comp and benefits. Leaving them out is the most common reason a weekly prime cost looks two to five points better than the P&L.

How often should I check prime cost?

Weekly. Monthly is too late to change anything, and daily is too noisy. A Monday routine using last week's sales, purchases and payroll takes about 30 minutes and catches problems while they are still one week old.

Is a lower prime cost always better?

No. A prime cost well below the range for your concept usually means understaffing, under-portioning or deferred quality, and guests feel it before the numbers show it. Aim for the range, hold it steadily, and spend the savings where guests notice.