Free Prime Cost Check for Restaurants

Type in four numbers and see the percent that decides whether your month makes money.

After 20 years running food and beverage operations, we can tell you the number that separates a profitable month from a bad one is prime cost: your food, beverage and labor cost added together, as a percent of sales. Most managers only see it when the P&L shows up, weeks after the money is already gone.

The Prime Cost Check puts that number in front of you every week. Enter your email below and you get it right away: an Excel sheet that works out your prime cost percent from last week's numbers, plus a one page guide.

How to use it

1

Pull last week's total sales, food cost, beverage cost and labor cost from your POS, invoices and payroll. For labor, include payroll taxes and benefits, not just wages.

2

Type the four numbers into the sheet. It shows your prime cost percent right away.

3

Do it again every Monday. A number you check weekly is a number you can still fix before the month closes.

What is inside the sheet

One Excel tab, three steps, about ten minutes. It opens in Excel or Google Sheets, and every calculation is already built in. You only type in the yellow cells.

  1. Step 1: enter last week's numbers. Net sales (after discounts, before tax and tips), food cost, beverage cost and total labor cost, plus your target prime cost percent. Food and beverage cost means purchases adjusted for the inventory change: beginning inventory plus purchases minus ending inventory.
  2. Step 2: see where you land. Food, beverage and labor each as a percent of sales, your prime cost in dollars and percent, how many points you are over or under target, what that is in dollars, and a one word result.
  3. Step 3: if it is high, work the 5 point checklist. Vendor invoices for price jumps and missing credits, actual against theoretical usage on your top 10 items, portion spot checks on your five best sellers, labor hours against covers by shift, and a full week of waste logging.

A sample week

This is the example loaded in the sheet when you open it: a full service restaurant with $42,000 in net sales for the week and a 62 percent target.

LineDollars% of sales
Net sales$42,000100.0%
Food cost$11,80028.1%
Beverage cost$3,9009.3%
Labor cost (wages, salaries, payroll tax, benefits)$10,50025.0%
Prime cost$26,20062.4%

At 62.4 percent this week is 0.4 points over the 62 percent target, which is $160. The sheet calls that Watch it: not a problem yet, but worth knowing which line moved before next Monday. Run the same week at 66 percent and the gap is $1,680, or more than $87,000 over a year if it holds.

What your number means

  • Full service restaurants: most aim for 60 to 65 percent. Under 60 is strong, as long as service and portions are not being cut to get there.
  • Quick service and fast casual: usually 55 to 60 percent.
  • Bar led concepts: often 50 to 55 percent, because liquor carries a lower cost than food.
  • Fine dining and private clubs: often 62 to 68 percent, because labor runs higher.
  • Over your band: look at which of the three lines moved, then work the checklist in Step 3, starting with the line that moved most.

Who it is for

General managers, kitchen managers, bar managers and owners who want one honest number every Monday without buying software. If you already run a full P&L every week, it is a quick cross check. If you only see the P&L once a month, it is the earliest warning you will get.

Free download. Enter your email in the form above and the sheet arrives in your inbox, with the one page guide.

Get the free sheet Read the full prime cost guide

FAQ

What is prime cost?

Prime cost is your cost of goods sold (food and beverage) plus your total labor cost, including payroll taxes and benefits. Divide it by total sales and multiply by 100 to get your prime cost percent.

What is a good prime cost percentage?

Most full service restaurants aim for roughly 60 to 65 percent of sales. Under 60 is strong. Over 65 usually means one of the three costs is running away from you, and the sooner you see it the cheaper it is to fix.

How often should I check it?

Weekly. The monthly P&L arrives too late to change the month you are in. A weekly check gives you time to adjust ordering and the schedule while it still matters.

Is it really free?

Yes. Enter your email and the sheet arrives in your inbox. You will also get a few short emails on what to do with the number, and you can unsubscribe any time.

Does it work in Google Sheets?

Yes. It is a standard Excel file with simple formulas, so it opens in Excel, Google Sheets or Numbers. Upload it to Google Drive and open it with Google Sheets to use it on a phone or tablet.

What should I include in labor cost?

Hourly wages, the weekly share of salaried managers, employer payroll taxes, workers' comp and benefits. Wages alone usually understate labor by 15 to 25 percent, which makes prime cost look better than it is.

What is the difference between this and the prime cost calculator?

The calculator on our site gives you a quick answer in the browser. The Prime Cost Check is a sheet you keep, so you can save each week, compare it to your target and work the five point checklist when the number is high.

If your prime cost came in high, the Finance and Cost Control Bundle tracks food cost, variance, break even, cash flow and labor week by week. If you would rather have a second set of eyes on your numbers, we work with operators directly.

Finance and Cost Control Bundle

View on Etsy

OpsEdge Consulting

See how we work